Skip to content

Fig. 01 / Practice / Five services

Hover or tap a row to open it

Buildings thatkeep reporting back.

We design new buildings, repair old ones and measure both for as long as they stand. Every service runs on the same live model, so a survey today becomes the monitoring of the next decade.

Founded
2009
People
40
Projects
38
Countries
14

Fig. 02 / Services / One studio, one model

Five services / one team / one model per building

From a first sketchto the annual audit.

  • Every new building starts from a scanned site and is designed in the same model that will later monitor it. One partner leads the whole team from the first sketch to the keys, and the studio stays for the first ten years of use.

    Typical size
    2 000 to 15 000 m²
    Structure
    Timber first
    Team
    6 to 14 people
  • A building that is already standing holds most of its carbon. We scan it to 2 mm, find what is sound, and design the repairs and the new use around the structure that is already there, so the cheapest tonne of carbon stays in the walls.

    Survey accuracy
    2 mm
    Carbon saved vs new build
    55 to 70%
    Delivery
    8 to 24 months
    R-01 LINTELR-02 SILL8 CONTROL POINTS / RMS 1.4 MM
  • A two-person crew captures the building in a day with a robotic total station and drone lidar. Within 48 hours you receive the registered point cloud, a clean model built from it and a report of every place the building differs from its drawings.

    Scan density
    2 mm at 10 m
    Delivery
    48 h
    Output
    Point cloud, model, deviation report
  • We fit sensors for heat, air, light and movement, compare every reading with the design model and send a short report each month. At the end of each year an audit sets out what to tune, repair or leave alone.

    Sensors per 1 000 m²
    38
    Sample interval
    60 s
    Report
    Monthly
  • In three weeks we test the site, compare massing options and set a carbon budget for each, with a cost range you can take to a board. Many studies end in a smaller building, a retrofit or a decision not to build at all.

    Turnaround
    3 weeks
    Deliverable
    Massing, carbon budget, cost range
    A / TOWER / 410 TB / BLOCK / 300 TC / LONG BAR / 260 TCARBON BUDGET A1 TO A3 / OPTION C CARRIED

Fig. 03 / Who we work with / Clients

Owners who keep their buildings for decades

Owners who planin decades.

  • C.01MunicipalitiesLibraries, schools and civic buildings that must last a century.
  • C.02Cultural institutionsHalls and museums where crowds, light and air change by the hour.
  • C.03Housing cooperativesHomes owned by the people who live in them and pay the bills.
  • C.04UniversitiesTeaching and research buildings used as living laboratories.
  • C.05Hospital estatesWards and plant rooms surveyed and monitored while in use.

Fig. 04 / Next step / Engage the studio

Replies within two working days

Bring us a building,standing or still on paper.

Made with Modulify