A / Carbon avoided
t CO2e per year against a code-minimum baseline
412
t CO2eAvoided 2017 to 2025
| Year | Avoided |
|---|---|
| 2017 | 18 t |
| 2018 | 24 t |
| 2019 | 31 t |
| 2020 | 38 t |
| 2021 | 47 t |
| 2022 | 55 t |
| 2023 | 64 t |
| 2024 | 72 t |
| 2025 | 63 t |
Fig. 01 / Hallmark Library / Point cloud
Local grid / 1 : 400
(01) Capture / Project / Live lidar
Norrvik scans, measures and models every structure we touch, then keeps the model alive after handover, measured to the millimetre.
Scene 01 of 04, Capture. The ground truth for every building.
Fig. 06 / Manifesto / Studio position
Read slowly / 34 words
We measure buildings the way surgeons measure bodies: completely, repeatedly, and before we cut. Then we stay. Every wall we raise keeps reporting back, so the next building is wiser than the last one.
Fig. 07 / Platform / Survey to archive
Four instruments / one live model
01Capture
Every site is scanned before we draw,so the first line sits on real ground.
02Model
Architecture, structure and energy shareone model, rebuilt against every survey.
03Monitor
Heat, air, light and movement stream in,checked against the design every hour.
04Archive
Scans, drawings and decisions in open formats,indexed by place and checked every week.
Fig. 08 / Evidence / Portfolio data
38 projects / 14 countries / measured after handover
Every figure below comes from readings taken in finished buildings, not from design-stage models. Hover or use the arrow keys on any chart to read exact values.
A / Carbon avoided
t CO2e per year against a code-minimum baseline
412
t CO2eAvoided 2017 to 2025
| Year | Avoided |
|---|---|
| 2017 | 18 t |
| 2018 | 24 t |
| 2019 | 31 t |
| 2020 | 38 t |
| 2021 | 47 t |
| 2022 | 55 t |
| 2023 | 64 t |
| 2024 | 72 t |
| 2025 | 63 t |
B / Daylight
Share of each hour above 300 lux / 24 h by 12 months
Peak
Jun / 12:00 / 78%
| Month | 00:00 | 01:00 | 02:00 | 03:00 | 04:00 | 05:00 | 06:00 | 07:00 | 08:00 | 09:00 | 10:00 | 11:00 | 12:00 | 13:00 | 14:00 | 15:00 | 16:00 | 17:00 | 18:00 | 19:00 | 20:00 | 21:00 | 22:00 | 23:00 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Jan | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 1% | 8% | 15% | 18% | 15% | 8% | 1% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Feb | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 6% | 15% | 23% | 26% | 23% | 15% | 6% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Mar | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 1% | 8% | 19% | 30% | 37% | 40% | 37% | 30% | 19% | 8% | 1% | 0% | 0% | 0% | 0% | 0% | 0% |
| Apr | 0% | 0% | 0% | 0% | 0% | 0% | 3% | 13% | 24% | 37% | 47% | 54% | 56% | 54% | 47% | 37% | 24% | 13% | 3% | 0% | 0% | 0% | 0% | 0% |
| May | 0% | 0% | 0% | 0% | 0% | 5% | 15% | 27% | 40% | 52% | 62% | 68% | 70% | 68% | 62% | 52% | 40% | 27% | 15% | 5% | 0% | 0% | 0% | 0% |
| Jun | 0% | 0% | 0% | 0% | 3% | 12% | 23% | 36% | 49% | 61% | 70% | 76% | 78% | 76% | 70% | 61% | 49% | 36% | 23% | 12% | 3% | 0% | 0% | 0% |
| Jul | 0% | 0% | 0% | 0% | 3% | 12% | 23% | 36% | 49% | 61% | 70% | 76% | 78% | 76% | 70% | 61% | 49% | 36% | 23% | 12% | 3% | 0% | 0% | 0% |
| Aug | 0% | 0% | 0% | 0% | 0% | 5% | 15% | 27% | 40% | 52% | 62% | 68% | 70% | 68% | 62% | 52% | 40% | 27% | 15% | 5% | 0% | 0% | 0% | 0% |
| Sep | 0% | 0% | 0% | 0% | 0% | 0% | 3% | 13% | 24% | 37% | 47% | 54% | 56% | 54% | 47% | 37% | 24% | 13% | 3% | 0% | 0% | 0% | 0% | 0% |
| Oct | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 1% | 8% | 19% | 30% | 37% | 40% | 37% | 30% | 19% | 8% | 1% | 0% | 0% | 0% | 0% | 0% | 0% |
| Nov | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 6% | 15% | 23% | 26% | 23% | 15% | 6% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Dec | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 1% | 8% | 15% | 18% | 15% | 8% | 1% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
C / Performance
Six monitored buildings, ranked
Sorting
kWh/m² a year / lower is better
D / Materials
Share of structural mass across the portfolio
| Material | Share |
|---|---|
| Timber | 46% |
| Concrete | 27% |
| Steel | 14% |
| Glass | 9% |
| Other | 4% |
Fig. 09 / Selected work / Still reporting
Hover a row for its live scan
Fig. 10 / Atlas / Where the models live
2 offices / 6 buildings / dashed lines lead from each office
Stockholm leads the work around the Baltic and the North Atlantic, Lisbon leads the Atlantic coast. Select a project marker to fly to it and read its facts.
Open the full atlasFig. 11 / Field reports / Notes from site
Written by the partners who took the readings
Fig. 12 / Engage / Start a commission
Replies within two working days